Sunday, 31 December 2017

A better City Transport System

mgZero: A solution to traffic problems


The Problem:

Traffic Congestion is a problem many big and small cities are facing.
  1. Bangkok, Thailand
  2. Mexico City, Mexico
  3. Bucharest, Romania
  4. Jakarta, Indonesia
  5. Moscow, Russia
  6. Chongqing, China
  7. Istanbul, Turkey
  8. St. Petersburg, Russia
  9. Zhuhai, China
  10. Santiago, Chile
  11. Guangzhou, China
  12. Shijiazhuang, China
  13. Shenzhen, China
  14. Los Angeles, U.S.
  15. Beijing, China
Surprisingly, Delhi, Bangalore, Mumbai, Chennai and Hyderabad are not in this list but given the increasing number of cars getting on roads everyday, these cities may even top the list very soon.

The advent of Metro Rail Transport System in India has proved to be big relief in conjunction with construction of new roads, highways and expansion of already existing infrastructure.

It is worth noting that congestion on roads can prove to be fatal sometimes.
Imagine a surgeon responding to an emergency call. He has to rely on traffic to save his patient. 
This is just one example and quoted because most of us would agree to it. 

Conventional Solutions:

There are many solutions designed and deployed to tackle this problem. Few of the solutions include:
  1. Metro Trains.
  2. Strengthening of public buses.
  3. Construction of new roads and expansion of present ones.
  4. Smarter signaling mechanisms.
There can be more but these are the ones i could think of as of now.

A better solution:

Ropeways!

Wait!.
There is a missing element here. 

I like to call it "mgZero Balloon".

The idea is pretty simple:
Weight of an object is the product of its mass and force acting upon it. So any object hanging on a rope has its weight = Mass x Acceleration due to gravity. 

So the rope has to exert force in opposite direction to the pod's weight. This force comes by the strength of the rope and its tension. If tension is less than the threshold, the pod will come closer to the ground.

Now, if we attach a big hot air balloon on top of these pods, so that the upward force exerted by the balloon is equal to or bit less/more than the weight of the pod, the strength of the cable needed earlier is now reduced as it has to oppose less force (mg=negligible) acting downwards now. 

Now the balloon is a well designed structure and has so much of surface area that it can well be used for advertisement purposes which, in turn can let the city administration/ state government earn revenue. 

Because the effective weight of pods is now Zero, the amount of energy required to propel the pods is also reduced significantly. So a BLDC motor with propeller attached mounted on each pod can now propel the pod back and forth. 
Thrust vectoring can be one way of using one propeller,single direction rotation motor to achieve motion in both directions.

Remember, I said the balloons will be huge, So we can have Solar panels on the top surface to generate electricity,store it in batteries and energize both the Hot air system and propulsion system. This can be an ambitious objective but given the efficiency of solar cells reaching as high as 40%, it might not be impossible. If this works, we might have a transport system that would not require energy from the grid for its operation. 
Energy required for elevators and other infrastructure would still have to come from grids though.

With the introduction of mgZero balloon, the space between two consecutive support pillars can now be increased multi-fold as compared to conventional ropeways. This would mean huge cost savings.

With the advancement in solar and battery technologies, we may have a system with zero carbon footprint in near future.

Benefits: 

This system is scalable and will ensure short transit times. The placement of boarding /deboarding points will have to be strategically selected, like airports,metro interchange stations, Bus Terminals and Railway stations. 
In first phase, it can be deployed on routes that are most congested. 

Transportation Capacity:

  1. 10 persons per pod. 
  2. 1km per minute (60kmph) transit time.
  3. For 1 km apart stations,  the frequency of pods will be 1 per minute if only one pod is present on the line. 

Issues to be addressed:

  1. What happens if cable breaks and/ or pod falls off?
  2. Effect of weather conditions?
....contd.( Will be updated soon, feel free to feed me your thoughts/ideas). 
Thanks for reading!